Prepare
- racks (cabling, power, network)
- interconnect, stretch vlan’s, new switches etc
Move
- Start physically moving nodes
Logical Cutover at 50% moved
- Transfer central controller, file servers etc..
- Move default gateway
- Validation
Move
- Continue physically moving nodes
Aftercare