Back to Overview

Prepare:

  • Prepare racks (cabling, power, network)
  • Reduce the workload to 0

Cutover

  • Shutdown
  • Disconnect
  • De-install servers
  • prepare & move the servers
  • Install the servers
  • Re-connect
  • Startup
  • Validation

Production

  • Ramp-up
  • Aftercare